Archive

UDK: 69.003.2.004.11
DOI: n/a

Published: Građevinar 55 (2003) 8
Paper type: Preliminary report
Download article (Croatian): PDF
Download article (English): n/a

Change in price structure of construction work

Stjepan Bezak

Abstract

The methodological approach for the determination of the price change coefficient for construction work, legally permitted for work performed within the contract time, is described in the paper. The structure of construction works is presented based on the model of standard calculation of construction works. The equation for the calculation of this coefficient is presented and analyzed in the scope of the method for price change coefficient determination. The implementation of the method is illustrated by an appropriate case study.

Keywords
price structure, price change, price change coefficient, program package SKGA, construction works, price

HOW TO CITE THIS ARTICLE:

Bezak, S.: Change in price structure of construction work, GRAĐEVINAR, 55 (2003) 8

OR:

Bezak, S. (2003). Change in price structure of construction work, GRAĐEVINAR, 55 (8)
Authors:

Stjepan Bezak
University of Zagreb,
Faculty of Civil Engineering